Kitchen Civils were awarded the Main Contractor contract on Beverley South/Minster Way Roundabout and Highway Infrastructure Works in February 2019.
Minster Way is a large trunk road between Beverley & Bridlington and the M62.
As part of the East Riding of Yorkshire Council’s Beverley J plan, a new roundabout was to be built on the existing infrastructure to provide access to a new housing development and a new Park & Ride to provide traffic decongestion to Beverley town centre.
Scope of Works
- Bulk Earthworks circa 11,500m3
- Large diameter drainage and Foul and Surface Water Pumping Station
- New 4 Arm Roundabout on a live carriageway
- Construction of 1500m of new carriageway
- Surface Water Attenuation
- De-watering
- Planing, Surfacing and Tie In’s to existing infrastructure
- HV Ducting and Mains Services
- Lighting and Signage
- Traffic Management and Diversions
- Stakeholder engagement with Local Authority, Internal Drainage Boards, Utility Providers, and existing residents.
- Value Engineering for the client