Beverley South

Main Contractor

Kitchen Civils were awarded the Main Contractor contract on Beverley South/Minster Way Roundabout and Highway Infrastructure Works in February 2019.

Minster Way is a large trunk road between Beverley & Bridlington and the M62.

As part of the East Riding of Yorkshire Council’s Beverley J plan, a new roundabout was to be built on the existing infrastructure to provide access to a new housing development and a new Park & Ride to provide traffic decongestion to Beverley town centre.

Scope of Works

  • Bulk Earthworks circa 11,500m3
  • Large diameter drainage and Foul and Surface Water Pumping Station
  • New 4 Arm Roundabout on a live carriageway
  • Construction of 1500m of new carriageway
  • Surface Water Attenuation
  • De-watering
  • Planing, Surfacing and Tie In’s to existing infrastructure
  • HV Ducting and Mains Services
  • Lighting and Signage
  • Traffic Management and Diversions
  • Stakeholder engagement with Local Authority, Internal Drainage Boards, Utility Providers, and existing residents.
  • Value Engineering for the client
  • Location:
    Beverley, East Yorkshire
  • Contract Type:
    Bespoke
  • Contract Length:
    17 months
  • Value:
    £2.4m