KITCHEN CIVILS DELIVER MAJOR VIADUCT STRENGTHENING WORKS FOR NETWORK RAIL RCDP FRAMEWORK CONTRACTOR AT FRODINGHAM VIADUCT

Network Rail identified failure of the structure, principally a number of arches were fractured centrally and this had reduced the life span of the bridge that required returning to standard. Kitchen Civils were engaged at design and development stage by Taziker Industrial to undertake the delivery of all work aspects as a Specialist Subcontractor.